Bus duct in the indoor low-voltage power transmission trunking project to replace the wire and cable. In foreign developed countries and China, Hong Kong, Macao and other popularity. For busway said, busbar problems, as employees should be how to check the busbar, busway inspection requirements are as follows

Busbar when the subject appears, need to check after the transmission of electricity as needed, fault busbar can not transmit electricity without checking. Otherwise, the accident may become bigger. When the busway fault is found, it should be isolated faster, and the busway transmission should be resumed after isolation, and the blackout transmission with external power supply should be considered to avoid the tripping of the connecting route.

When the point of failure is found, if isolation is not possible, and if one set of busbars in a double busbar fails, the components on the faulty busbar should be inspected immediately, and after confirming that there is no end of the fault, the running busbar should be cooled down and transmission resumed, and the connecting routes should be prevented from being switched on during the non-contractual period. When the fault cannot be found after a series of investigations, feed power from an external source.

When a fault occurs in a group of busbars of a double busbar, a generator can be used to step up the busbars from zero start, or an external power supply can be used to transmit power to the faulty busbar, and attention must be paid to the protection of the busbar differentials and to the mode of operation in these schemes. Wiring busway failure, if you can not find the point of failure, you can use the power supply of this site to use electricity, the test switch must be good, there must be complete relay protection.

Guangdong Shunde Møllerød Electric Co., Ltd. was registered in January 14, 2002 in Foshan City, Guangdong Province, Shunde District, Ronggui, Makang Industrial Zone, Jinmao Road, No. 7, and in Nantong, Jiangsu Province, with a branch factory, is a professional R & D, production, sales of high-voltage busbar systems, high-voltage and low-voltage complete sets of equipment, bridges, and other private enterprises, with a registered capital of 15 million yuan, whose predecessor, Zhendong Cable Bridge Factory, was built in 1998, has more than 50 million yuan of fixed assets, now has a fixed asset of more than 50 million yuan. Now has fixed assets of more than 50 million yuan, covers an area of 38,000 square metres, plant area of 13,200 square metres. The company has 208 employees, 80% of whom are majors in large and medium-sized professions. Mr Luo Jianhua, the legal representative of the company, leads all the employees of the factory to innovate and make joint efforts, and the annual production capacity is more than one hundred million yuan.

©Guangdong Shunde Molfo ElectrIcco.,Ltd. Copyright 粤公网安备 44060602000635号   粤ICP备09222365号 Designed by:ONEDI.NET